Welcome to Hotenda.com Online Store!

logo
userjoin
Home

MAX6738XKSD3+

MAX6738XKSD3+

MAX6738XKSD3+

Maxim Integrated

1.8V 5 Terminals Voltage supervisor 2 Channels

SOT-23

MAX6738XKSD3+ Datasheet PDF

non-compliant

Technical Specifications

Parameter NameValue
TypeParameter
Surface MountYES
PackagingTape & Reel
JESD-609 Code e3
Pbfree Code yes
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Number of Terminations 5
ECCN Code EAR99
Terminal Finish Matte Tin (Sn)
Additional FeatureRESET THRESHOULD VOLTAGES IS 2.925 VOLTS
HTS Code8542.39.00.01
Technology BICMOS
Terminal Position DUAL
Terminal FormGULL WING
Peak Reflow Temperature (Cel) NOT SPECIFIED
Number of Functions 1
Supply Voltage 1.8V
Terminal Pitch0.65mm
Reach Compliance Code compliant
Time@Peak Reflow Temperature-Max (s) NOT SPECIFIED
JESD-30 Code R-PDSO-G5
Operating Temperature (Max) 85°C
Operating Temperature (Min) -40°C
Supply Voltage-Max (Vsup) 5.5V
Temperature GradeINDUSTRIAL
Supply Voltage-Min (Vsup) 1V
Number of Channels 2
Analog IC - Other Type POWER SUPPLY SUPPORT CIRCUIT
Adjustable Threshold YES
Length 2mm
Height Seated (Max) 1.1mm
Width 1.25mm
RoHS StatusRoHS Compliant
In-Stock:4928 items

MAX6738XKSD3+ Product Details

MAX6738XKSD3+ Overview


Power management is mounted through 5 terminals. Power management is packaged in a Tape & Reel way. Power management is possible to find a series of 1 functions. A series of 2 channels can be found on this supervisor. The package peak reflow temperature is specified to be NOT SPECIFIED. The supervisor is always powered by a 1.8V volt supply. There are other features such as RESET THRESHOULD VOLTAGES IS 2.925 VOLTS to name a few. Other IC kinds, such as POWER SUPPLY SUPPORT CIRCUIT are included in the power management system. IC management has a maximum operating temperature of 85°C. Voltage supervisor operates with a -40°C working temperature at the very least.

MAX6738XKSD3+ Features




MAX6738XKSD3+ Applications


There are a lot of Maxim Integrated
MAX6738XKSD3+ Voltage Supervisors applications.


  • Power distribution systems of operating room
  • Power distribution systems of infant care room
  • Power distribution systems of ICU
  • Power distribution systems of CCU
  • emergency room
  • Medical-specific isolation transformer
  • Medical-specific insulation monitor
  • Transformer load monitoring equipment
  • External alarm
  • Display equipment

Get Subscriber

Enter Your Email Address, Get the Latest News